Skip to content
OnMSFT.com
  • Home
  • About
  • Contact
  • News
  • How-to
  • Feature stories
  • Deals
  • Microsoft / office 365
  • Reviews
Menu
  • Home
  • About
  • Contact
  • News
  • How-to
  • Feature stories
  • Deals
  • Microsoft / office 365
  • Reviews
  1. Home
  2. News
  3. Microsoft and the University of Texas are working towards a battery-powered future

Microsoft and the University of Texas are working towards a battery-powered future

Laurent Giret Laurent Giret
August 17, 2016
2 min read

As is Microsoft is currently transitioning from a software vendor to a mobile-first, cloud-first company, the Redmond giant is currently increasing its data center investments worldwide. The company also seems committed to build greener houses for its data as we reported earlier this year that Microsoft researchers built “Project Natick”,  a prototype of a self-contained data center that can function hundreds of feet below the surface of the ocean.

Moreover, the company is exploring other ideas to build better data centers that generate less pollution and are cheaper to operate: according to a new report from the San Antonio Business Journal, Microsoft is working with researchers at the University of Texas and several companies in the energy sector to developer battery-powered data centers.

The company has donated $1 billion to UTSA for the battery research in exchange of tax abatement on the construction of its second data Center in San Antonio, Texas. While Microsoft will invest $1 billion over seven years on this latest facility, company officials acknowledged earlier that electricity costs can surpass construction costs over the life of a data center.

The battery research will bring together Microsoft, UTSA, Australian liquid battery manufacturer Redflow Energy Storage Solutions Inc., German maker of a cell cube battery Gildemeister Energy Solutions and more. Sean James, senior project manager of research at Microsoft explained:

It doesn’t take a Ph.D. to know that we are entering a new industrial revolution. … And companies like Microsoft are building the factories for this new industrial age. Microsoft is committed to fueling these new factories with sustainable energy.

The partners are exploring the use of liquid-flow batteries which replace lithium or lead acid by fluid, and these liquid-flow batteries can separate electricity generation from storage. While current data centers have several backup energy sources in case of power outages (including expensive and not so green diesel generators), battery-powered data centers would no longer need these alternative source of powers.

Additionally, these liquid-flow batteries could be directly linked to power grids to store energy from renewable sources such as wind or solar. However, we’re still years away from a concrete application and it’s still not guaranteed that these battery-powered data centers could enable cost savings.

Further reading: Cloud, Data Center, Microsoft

Share this article:
Tags:
Cloud Data Center Microsoft
Previous Article More bug fixes for Minecraft ahead of big new MineCon reveals in latest Snapshot Next Article Electronic Frontier Foundation says Windows 10 upgrade tactics are “annoying to downright malicious”

Related Articles

Chrome tests Google Drive file uploads in the AI Mode compose box

April 14, 2026
Gemini image creation using right click desktop Chrome

Chrome lets you remake images with Gemini on desktop using just a right-click

April 13, 2026
Samsung Display crosses 5 million QD-OLED monitor shipments as demand grows fast, with new panels and strong premium market expansion worldwide.

Samsung Display Ships 5 Million QD-OLED Monitor Panels in Four Years

April 9, 2026

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Chrome tests Google Drive file uploads in the AI Mode compose box
  • Chrome lets you remake images with Gemini on desktop using just a right-click
  • Samsung Display Ships 5 Million QD-OLED Monitor Panels in Four Years
  • Intel Arc Pro B70 Teardown Reveals Blower Cooler and Early Board Design Details
  • Users Modify RTX 5090 Lightning Z Hardware to Unlock MSI’s Restricted 2500W BIOS

Recent Comments

  1. XxRIVTYxX on Intel Says It Tried to Help Before Crimson Desert Dropped Arc Support
  2. Gaurav Kumar on Chrome Prepares Nudge to ‘Move Tabs to the Side’ as Vertical Tabs Near Release
OnMSFT.com

The Tech News Site

Categories

  • Windows
  • Surface
  • Xbox
  • How-To
  • OnPodcast
  • Gaming
  • Edge
  • Teams

Recent Posts

  • Chrome tests Google Drive file uploads in the AI Mode compose box
  • Chrome lets you remake images with Gemini on desktop using just a right-click
  • Samsung Display Ships 5 Million QD-OLED Monitor Panels in Four Years
  • Intel Arc Pro B70 Teardown Reveals Blower Cooler and Early Board Design Details
  • Users Modify RTX 5090 Lightning Z Hardware to Unlock MSI’s Restricted 2500W BIOS

Quick Links

  • About OnMSFT.com
  • Contact OnMSFT
  • Join Our Team
  • Privacy Policy
© 2010–2026 OnMSFT.com LLC. All rights reserved.
About OnMSFT.comContact OnMSFTPrivacy Policy