Skip to content
OnMSFT.com
  • Home
  • About
  • Contact
  • Windows
  • Surface
  • Xbox
  • How-To
  • OnPodcast
  • Edge
  • Teams
  • Gaming
Menu
  • Home
  • About
  • Contact
  • Windows
  • Surface
  • Xbox
  • How-To
  • OnPodcast
  • Edge
  • Teams
  • Gaming
  1. Home
  2. News
  3. Interxion Expands and Upgrades Dusseldorf Data Centre

Interxion Expands and Upgrades Dusseldorf Data Centre

Ron Ron
September 15, 2019
2 min read

INTERXION HOLDING NV, (NYSE: INXN), a leading European provider of carrier-neutral colocation data centre services, today announced the expansion and upgrade of its Dusseldorf data centre. The 500 m2 expansion, scheduled for completion in the spring, will enable Interxion to continue to meet growing customer demand for colocation space and services, in particular from customers in the fast-growing digital media, carrier, and enterprise sectors. Simultaneously, a number of significant upgrades are being made, including an increase in the data centre’s power grid connection to 20 MVA, and the installation of new transformers and new air conditioning systems, bringing total recent investment in the site to €10 million.

The increased power supply, in combination with two new transformers with a total capacity of 3,200 kW, will address the current and future needs of customers running cloud-based applications or virtualised servers that primarily operate high-density configurations and therefore need to maximise the usage of their data centre capacity. The capacity of the air conditioning system has also been increased by 2,000 kW; two supplementary backup generators are being installed and the facility’s uninterrupted power supply (UPS), which can be operated in a 2N configuration, is being expanded.

Work has already started on both expansion and upgrades and should be completed in the second quarter of 2011. Once complete, customers will also benefit from enhanced power monitoring systems and building control systems.

“This expansion is being driven by our most technically demanding customers, and as a result it will allow us to maintain our edge in the delivery of highly redundant, highly reliable services with the highest possible power density to new as well as existing customers,” explained Peter Knapp, Managing Director, Interxion Germany. “With access to over 50 communication networks as well as the ECIX Internet exchange combined with leading-edge power and cooling, our Dusseldorf facility provides an ideal environment for customer applications as cloud-based infrastructure and delivery become even more widespread.”

Share this article:
Previous Article Microsoft, Skype deal approved by European Commission Next Article How to Install Windows 8 in VirtualBox

Related Articles

Nintendo Reportedly Planning Zelda Ocarina of Time Remake and Special Switch 2 Console

March 30, 2026

PUBG: Blindspot Shut Down Just Two Months After Early Access Launch

March 30, 2026

AMD Ryzen 9 9950X3D2 Hits DDR5-8800 With Tight CL32 Timings on ASUS X870E APEX

March 30, 2026

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Nintendo Reportedly Planning Zelda Ocarina of Time Remake and Special Switch 2 Console
  • PUBG: Blindspot Shut Down Just Two Months After Early Access Launch
  • AMD Ryzen 9 9950X3D2 Hits DDR5-8800 With Tight CL32 Timings on ASUS X870E APEX
  • AMD Ryzen AI 7 445 Tested: New Chip Falls Behind Older Ryzen AI 5 340
  • This Fake Samsung 990 PRO SSD Looks Legit Until You Copy Large Files

Recent Comments

  1. XxRIVTYxX on Intel Says It Tried to Help Before Crimson Desert Dropped Arc Support
  2. Gaurav Kumar on Chrome Prepares Nudge to ‘Move Tabs to the Side’ as Vertical Tabs Near Release
OnMSFT.com

The Tech News Site

Categories

  • Windows
  • Surface
  • Xbox
  • How-To
  • OnPodcast
  • Gaming
  • Edge
  • Teams

Recent Posts

  • Nintendo Reportedly Planning Zelda Ocarina of Time Remake and Special Switch 2 Console
  • PUBG: Blindspot Shut Down Just Two Months After Early Access Launch
  • AMD Ryzen 9 9950X3D2 Hits DDR5-8800 With Tight CL32 Timings on ASUS X870E APEX
  • AMD Ryzen AI 7 445 Tested: New Chip Falls Behind Older Ryzen AI 5 340
  • This Fake Samsung 990 PRO SSD Looks Legit Until You Copy Large Files

Quick Links

  • About OnMSFT.com
  • Contact OnMSFT
  • Join Our Team
  • Privacy Policy
© 2010–2026 OnMSFT.com LLC. All rights reserved.
About OnMSFT.comContact OnMSFTPrivacy Policy